Waiting
Now for the waiting game. Let us count the ways:
- My tank and toolbox are at Ross Thompson’s being repaired, and the tank is being re-plated.
- I sent all of my polished aluminum parts off to GL Custom Cycles in Van Nuis, California, to be polished, seeing as if I live to be 80 I’ll never figure out how it’s done properly.
- Autosport Seattle has my frame (in order to sleeve and re-bush the brake, center stand, and side stand pieces) and most of my engine for machining.
- I’m awaiting the arrival of my Domiracer order, which contains some of the parts needed before I can start in on the gearbox.
- Until the tank and frame are done, I cannot head off for the paint shop. I still need a chain guard, too.
All of that aside, I did receive my SRM order, and all of the parts seem to be of very good quality. It was very exciting to open the box and start unwrapping the “gifts” I had been sent!
I will take pictures of everything in its “clean kit o’ parts” state and post it in the next entry.
Running expense list:
$4,300 (previous entry total) ------ 300 Domiracer order of misc. bushings, etc. ====== $4,600
Running time clock*:
hours 53 (previous entry total) ---- 7 (misc.) ==== 60 (total to date)
*I work at a leisurely pace.
Comments Off on Waiting
No comments yet. Be the first to comment this post.
Sorry, the comment form is closed at this time.